How long does it take to complete gym floor refinishing, and what is the drying time?

The time it takes to complete gym floor refinishing depends on the size of the gym and the extent of the work required. On average, the process can take anywhere from 2 to 5 days, with a day or two dedicated to sanding and another couple of days for applying and drying the finish. For larger gymnasiums, the refinishing may take longer.

After the finish is applied, it requires adequate time to dry before the floor can be used again. Depending on the type of finish used, it can take anywhere from 24 to 48 hours for the floor to dry completely. It is important to allow the floor to cure fully before allowing any heavy traffic or activities to prevent damaging the newly refinished surface. By hiring skilled gym floor contractors, gym owners can ensure that the refinishing is done efficiently and that the floor is ready for use as soon as possible.